OKEBI Manufacturing
Built to Solve
Your Sourcing
Problems.
From prototyping to full-scale production, every step is designed to eliminate the friction, delays, and quality failures that drain B2B buyers' time and money.
What We Do Better
Six core manufacturing and service capabilities, each engineered to eliminate a specific pain point in B2B stainless steel sourcing.
OEM / ODM Production
We manufacture to your exact specs or develop entirely new product lines from scratch. Full flexibility on shape, size, capacity, and finish.
Customer Pain
Factories refuse small-batch ODM or charge prohibitive tooling fees, blocking brands from differentiating.
Surface & Logo Customization
Laser engraving, silk screen, heat transfer, electroplating, powder coating — every surface treatment available with precise color matching.
Customer Pain
Logos fade, peel, or bleed color after washing. Our UV-tested processes guarantee 1,000+ dishwasher cycles without degradation.
Material & Food Safety
Inner walls exclusively food-grade 304 or 316L stainless steel. All products tested for heavy metals, BPA, and lead. FDA & LFGB compliant.
Customer Pain
Hidden cheap liners, recycled steel, or non-compliant coatings that fail Amazon inspections and harm your brand reputation.
Packaging Design & Co-branding
Full packaging solutions from retail-ready gift boxes to bulk shipping cartons. Dieline design, print management, and fulfillment-ready pack.
Customer Pain
Mismatched packaging from different suppliers wastes time in coordination and creates inconsistent unboxing experiences.
Fast Prototyping
Sample production in 7–10 days. 3D rendering + physical sample delivered before committing to mass production. No minimum for samples.
Customer Pain
Waiting 4–6 weeks for a prototype, then discovering the sample doesn't match spec and the whole cycle starts over.
Third-Party QC & Inspection
We support SGS, BV, and buyer-designated QC inspections at any production stage — pre-production, during production, and pre-shipment.
Customer Pain
Factories that block inspections or only allow "final container check" — leaving buyers with no recourse for defects found at destination.
From Idea to Shipment
A transparent, six-stage process with fixed timelines and a dedicated account manager at every step.
Inquiry & Brief
Share your requirements — quantity, specs, branding, timeline, budget target.
Day 1–2
Quotation
Itemized pricing with BOM breakdown. No hidden costs. Tooling fees disclosed upfront.
Day 2–4
Sample & Approval
Physical sample produced and shipped. Revisions included until you sign off.
Day 5–15
Mass Production
Factory starts after deposit confirmed. Weekly photo/video production updates.
Day 16–45
QC Inspection
In-house QC + optional third-party inspection before packing. Full report provided.
Day 43–47
Shipment
Sea / air / express, FOB / CIF / DDP. Booking, customs docs, and tracking all handled.
Day 48+
⚠ Common Buyer Pain Points
Supplier goes silent after receiving deposit — no production updates for weeks
Mass production goods look completely different from approved sample
Surprise charges for mold changes, color proofing, or packaging printing plates
No documentation — can't clear customs or pass Amazon product compliance checks
Defects discovered only after goods arrive in your warehouse — too late to claim
✦ How OKEBI Solves It
Weekly production photos + milestone check-ins from your dedicated account manager
Golden sample locked in writing before production starts — any deviation triggers a hold
Full itemized quotation: every cost line visible before you confirm the order
We provide FDA/LFGB test reports, MSDS, CO, and customs code support as standard
Pre-shipment QC inspection with full photo report — defects caught before departure
Where Quality is Made
12,000 m² facility in Yongkang, Zhejiang — China's stainless steel drinkware manufacturing capital.
coming soon
Production Floor Area
Vertically integrated facility covering stamping, spinning, welding, polishing, coating, and assembly under one roof.
Production Staff
Including 18 dedicated QC inspectors. Senior engineers average 12 years in stainless steel drinkware manufacturing.
Annual Output (units)
Capacity to handle orders from 500-unit samples to multi-million unit retail programs without subcontracting.
Flexible Minimums from 500 pcs
Standard products from 500 units. Custom mold projects from 1,000 units. Scalable as your brand grows.
CNC Hydroforming
Precision forming for complex geometries without welding seams
Automated Welding
Robotic TIG/MIG welding lines for consistent leak-proof seals
Electroplating Line
PVD coating + chrome-free electroplating for durable metallic finishes
Spectral Analyzer
On-site XRF material testing — every steel coil verified before production
Insulation Test Chamber
Automated thermal retention testing — 24h cold / 12h hot standard test
Pressure Leak Test
100% of lids and seals pressure-tested before packaging
Digital Printing Line
Cylindrical UV printing for photographic-quality all-over graphics
CMM Measurement
Coordinate measuring machine for dimensional inspection of critical parts
Compliance You Can Verify
All certificates are current, transferable, and can be referenced on your Amazon listing, retail buyer forms, and customs documentation.
FDA Compliant
Food contact materials compliant with FDA 21 CFR regulations. Test reports available for all product categories.
USA / CanadaLFGB / EU Food Safety
German LFGB §31 and EU Framework Regulation (EC) 1935/2004. Migration testing by accredited lab.
EU / Germany / UKISO 9001:2015
Certified quality management system covering design, production, inspection, and continuous improvement.
GlobalBSCI / Social Compliance
Business Social Compliance Initiative audit passed. Meets ethical sourcing requirements for European and US retailers.
Retail / Private Label5-Stage Quality Control
A defect caught early costs nothing. A defect found at destination costs everything.
Stage 01
Incoming Material
XRF test every steel coil. Reject rate for incoming material: 0%
Stage 02
First Article
First 30 units inspected against golden sample before line runs
Stage 03
In-Process
Hourly random sampling — dimensions, weld integrity, surface finish
Stage 04
Pre-Shipment
AQL 2.5 inspection of finished goods + 100% leak test of lids
Stage 05
3rd-Party Audit
SGS / BV / buyer-designated inspection welcomed at any stage
Ready to Source Smarter?
Tell us your product requirements — we'll reply with a detailed quotation and sample lead time within 24 hours.